AMA worked closely with the SHU learning centre team to rethink how their award winning library building could be transformed to meet the needs of today’s students, address the rapidly changing work and teaching patterns in the future, and provide a bright and welcoming environment. Effective and rational panning allowed the retention of the same number of books and the number of study places was increased by 10% and each of these also had a larger footprint. The building is open 24/7, and was fully occupied during the refurbishment, which was carried out in the quietest time in 3 phases over 3 summers to minimise disruption.
Adsetts Learning Centre. Photo © AMA 2012 |
No comments:
Post a Comment