Showing posts with label Refurbishment. Show all posts
Showing posts with label Refurbishment. Show all posts

Friday, 14 March 2014

University of Loughborough’s Pilkington Library re-opens after Refurbishment

The Pilkington Library at Loughborough University has emerged smiling from a fast track building programme. It now has 1375 library seats, greatly improved facilities including a new reception and information desks as well as fully reconditioned WCs throughout. All this was accomplished in a three month building period during which the library was closed, but provided a comprehensive service in an alternative location. The secret of success in the process lies in several things:
  1. The comprehensive user briefing process that was able to take place at the start. AMA provided concept sketches and important design ideas. These were iteratively developed with the library staff  particularly to bring light and increased connectivity into the formerly gloomy building; 
  2. the decision to close the library so that the extensive work could be carried out enabling additional aspects of improvement to be added to the programme as they would not cause additional disruption;  
  3. the watchful eye, determined support and continuous communication with stakeholders provided by the Library staff, especially Brant Hickman, the Library Facilities Manager, who is more of a Chief Operating Officer rather than a FM. 

The briefing process, into which the Library staff had full input, was longer than the build process.  The project success supports the fact - widely acknowledged, though not always acted on - that good preparation pays off. Though the successful contractor offered a rather different layout initially, the Library used the AMA plans as their ‘base line’ and brought the project back in most respects to what they had agreed they wanted

Closing the entire library – the main one on campus - for three months was a bold action. This is never popular with students. However the alternative service provided was so excellent that there was not a single complaint throughout. This helped the project greatly by opening the way for much wider improvements than originally envisaged. These had originally focussed only on bringing the 4th floor into use for learning seats.  Instead, all 4 floors of the library have received an uplift, and all within the original time scale. This will avoid the need for future disruption to complete small but important additional projects throughout.

Brant and his colleagues had to return regularly to the building during the build process, to collect and return books from the storage zones, as part of the service to the students. This allowed them to engage with what was happening, to suggest improvements, prevent mistakes arising from misreading drawings and maintain good contact with the process so that they could keep stakeholders informed.

A more detailed article will follow. Meanwhile pictures can be accessed on the library's Flickr site here, and more about the project is available here.


Library interior, after the refurbishment
© University of Loughborough Library  
Library interior, after the refurbishment (same location as below)
© University of Loughborough Library 
Library interior, before the refurbishment
© University of Loughborough Library 
Library interior, before the refurbishment
© University of Loughborough Library





Tuesday, 11 March 2014

Prince Edward visits AMA project

Prince Edward, Earl of Wessex, visited Robert Browning Primary School in Walworth on the occasion of his 50th birthday. The school has recently been refurbished and extended with AMA's help.

AMA’s involvement in this project was all-encompassing. Our aim was to make the most of the existing spaces on a compact, urban site and create new, flexible opportunities for learning, which involved the wholesale reconfiguration of the existing Victorian school building, construction of a new entrance, new nursery building and outdoor play areas. 

Through a series of major structural interventions, we sensitively altered the physical restrictions of the existing Victorian building, and provided a prominent new entrance that welcomes visitors, improves security and bolsters the school's identity in its community. The alterations transformed circulation areas into useful learning spaces while clustering the ground floor classrooms and toilet facilities to improve the building’s organisation and legibility.

Read more on the project here, and see pictures of the Earl's visit here.

Robert Browning School after the refurbishment
Picture © AMA 2013



Monday, 3 March 2014

Adsetts Learning Centre reviewed positively by students

Sheffield Hallam University’s recently refrubished Adsetts Learning Centre, which was redesigned by AMA, has been received very positively by students. In the 2013 National Student Survey, 89% of SHU’s students praised the library and its resources. One student commented that 'it's just great in the learning centre. It's a place you really want to study in - as soon as you walk in you're in the mindset to work, in a really comfortable environment', while another thought that ‘the facilities are really good, particularly the learning centre. I find it really easy to concentrate there’.

AMA worked closely with the SHU learning centre team to rethink how their award winning library building could be transformed to meet the needs of today’s students, address the rapidly changing work and teaching patterns in the future, and provide a bright and welcoming environment. Effective and rational panning allowed the retention of the same number of books and the number of study places was increased by 10% and each of these also had a larger footprint. The building is open 24/7, and was fully occupied during the refurbishment, which was carried out in the quietest time in 3 phases over 3 summers to minimise disruption.

Adsetts Learning Centre. Photo © AMA 2012

Tuesday, 18 February 2014

New Offices for Southwark Council opened

Southwark Council are currently occupying the third and final building at Queens Road in Peckham, a major component in their Modernise 2 programme. This has been part of a continued rationalisation and upgrading of their workplace facilities including a Customer Contact Centre and space for administrative staff brought together from a number of locations. AMA with Mott McDonald and Overbury have helped the Council provide consistently more effective and appropriate spaces that not only bring the users together in the heart of the Borough, but also release other buildings and sites for better uses.
This follows on from the Council’s Modernise 1 programme which created an efficient and effective centralised facility for approximately 2000 workplaces in Tooley Street in 2009.



Inside Southwark's Queen's Road Offices
All pictures © AMA 2013

Friday, 29 November 2013

AMA's Peckham Library refurbishment featured in Architects' Journal

The refurbishment of Will Alsop's Peckham Library, which was led by AMA's David Jenkin, is featured in the Architects' Journal.

Since the opening of the iconic Peckham Library in 2000, AMA has helped Southwark Council, who runs the library, to provide two improvements. The first was the installation of additional floor space to provide a One Stop Shop in 2006, which was followed by a refurbishment of the library in 2012.

AMA’s David Jenkin’s experience of accommodating new and changing requirements into the Will Alsop building are recorded in the AJ article. Whilst the Peckham Library is a great building, he explains, it does not allow for easy changes due to restricted floor to ceiling heights and insufficient riser space, which may ultimately threaten to compromise the design in the future.

Peckham Library (photo: Mike Allport)

Thursday, 17 October 2013

Light Touch Library Refurbishments

AMA’s David Jenkin gave a presentation on ‘Light Touch Library Refurbishments’ at AMA on Tuesday. He explained how AMA has been helping Southwark council to transform three of its libraries: Will Alsop’s iconic Peckham Library, Dulwich Library, and currently Blue Anchor Library in Bermondsey.

AMA has been able to improve library facilities these locations substantially, with modest budgets. Through rearranging of shelving, relocating help desks and other facilities, making better use of daylight, and providing some artwork, it was possible to alter the look and feel of these libraries significantly. Previously, this simple approach to design was employed for the refurbishment of John Harvard Library, which AMA led in 2009/10.

In stark contrast to most boroughs, Southwark Council has an ongoing programme to improve the quality of their libraries and have recently opened their new Canada Water Library, while Camberwell Library is under construction.

AMA has a wide range of expertise in library design, and was involved in  the design and renovation of public and university libraries at international, national, regional, and local scale.

Dulwich Library (left), Peckham library (centre and right)
Photos: C. Ford, M. Allport, X. McGinnly

Wednesday, 2 January 2013

Happy New Year

Was 2012 the 'year of the refurbishment?'  We ended the year with the completion of a variety of educational, civic and library refurbishments. Below is a sample of some of our many projects from last year. For more information on these click here. We will keep updating you as we progress our current work in 2013.

Sample of AMA projects in 2012
Copyright © AMA 2013, Mike Allport 2013

Friday, 11 May 2012

Celebrating a 'new' refurbished primary school


On 11th May, Robert Browning Primary School in Southwark formally opened their newly refurbished and extended school with a summer 'street party' to also celebrate the Queen's Jubilee and the bi-centenary of Robert Browning's birth. The whole school community gathered together to create a spectacular event.  Over the last few years, AMA worked closely with the school to design a prominent new entrance that not only welcomes visitors, but also improves security and the school's identity in its community. In addition a new nursery building with a covered play space and  separate garden have also been added - all set in a newly landscaped playground. And finally, administration offices, ground floor classrooms, and toilet facilities were reconfigured to provide a new cluster of teaching spaces - making better use of the tight urban site and creating new, exciting places within the existing Victorian buildings.  

Friday, 20 April 2012

A forward thinking approach to a 'Children Looked After' facility

AMA's extensive refurbishment of 7 Talfourd Place for Southwark Council's 'Children Looked After' programme has just finished on site and has been handed over to the client. The project saw a complete reworking of the existing building to meet a complex brief and provide an uplifting and forward-thinking new facility.

UA-53860150-2